The professional responsible for overseeing a PAS 2035 retrofit from assessment to completion
The Retrofit Coordinator is one of the most important roles within PAS 2035, but it is also one of the most misunderstood.
A Retrofit Coordinator is not simply the person who uploads documents to TrustMark at the end of a project. Nor are they there merely to check that the right boxes have been ticked.
The role is much broader.
TrustMark describes the Retrofit Coordinator as the person who project manages the retrofit of a dwelling, overseeing the assessment, identification, specification and evaluation of energy efficiency measures and their subsequent monitoring and evaluation.
In practical terms, the Retrofit Coordinator is the professional responsible for making sure that the different parts of a PAS 2035 project work together.
That means connecting the Retrofit Assessment, Improvement Option Evaluation, Medium-Term Improvement Plan, Retrofit Design, installation, quality assurance, handover and evaluation into one coordinated process.
At PAS2035 Consultants Ltd, we believe this coordination is most valuable when it provides genuine technical oversight rather than becoming an administrative exercise. An experienced external Retrofit Coordinator can also provide an important degree of separation between the organisation installing the measures and the professional reviewing whether the overall retrofit strategy is appropriate.
Why Does PAS 2035 Need a Retrofit Coordinator?
Retrofitting an existing building is fundamentally different from installing an isolated product.
A house is a system.
Changing its insulation can affect heat loss, internal surface temperatures and moisture behaviour. Improving airtightness can affect ventilation. Replacing heating can alter heat demand. New windows can change both airtightness and ventilation provision. Wall insulation can create complicated junctions at roofs, floors, windows, doors and adjoining walls.
PAS 2035 therefore takes a whole-dwelling approach.
TrustMark describes this approach as considering the home, its environment, occupancy and the householders' objectives and behaviours when determining suitable improvements.
Someone consequently needs to maintain an overview of the entire process.
That is the Retrofit Coordinator.
The Coordinator should be able to look beyond an individual measure and ask:
Does this proposal make sense for this particular property, and have the interactions and risks been properly considered?
1. Reviewing the Retrofit Assessment
The process begins with understanding the existing building.
A Retrofit Assessor gathers information about the property, including its construction, condition, energy performance, occupancy and ventilation.
The Retrofit Coordinator needs to review that information and determine whether it provides an adequate basis for progressing the project.
That distinction matters.
The Retrofit Assessor collects and records information, while the Retrofit Coordinator uses that information as part of the wider decision-making process.
TrustMark's PAS 2035:2023 lodgement process starts with the Retrofit Assessment and progresses through identification of defects, agreement of Intended Outcomes, evaluation of Improvement Options, creation of the Medium-Term Improvement Plan, project risk assessment and Retrofit Design. T
If important information is missing at the beginning, it can create problems throughout the rest of the project.
A good Coordinator therefore does not simply accept an assessment because one exists. They should consider whether the information is sufficient for the proposed retrofit.
2. Identifying Risks and Existing Defects
PAS 2035 retrofit should not simply cover up existing building problems.
The Retrofit Coordinator therefore needs to consider defects and constraints that could affect the proposed work.
These might include damp, mould, water penetration, defective rainwater goods, inadequate ventilation, structural concerns, inappropriate previous alterations or problems with the existing building fabric.
Some defects may need to be addressed before retrofit measures can proceed.
Others may influence the design.
This is particularly important for older and traditional buildings, where understanding construction type and moisture behaviour can significantly affect the suitability of proposed measures.
The Coordinator's role is not necessarily to personally diagnose every specialist defect. Instead, they need to recognise where an issue requires investigation and ensure that appropriate information is obtained before the project progresses.
3. Establishing What the Retrofit Is Trying to Achieve
Every project should have a purpose.
PAS 2035:2023 includes the agreement of Intended Outcomes with the property owner as part of the process.
These might include reducing energy demand, improving thermal comfort, addressing particular building issues or achieving the requirements of a funding programme.
This sounds straightforward, but it is important.
Without clear outcomes, retrofit can become measure-led:
"We have funding for insulation, so where can we install insulation?"
A coordinated approach reverses the question:
"What does this property need, what are we trying to achieve, and which measures are appropriate?"
That is a much healthier starting point for retrofit.
4. Improvement Option Evaluation and the Medium-Term Improvement Plan
The Coordinator then considers how the property could be improved.
The Improvement Option Evaluation (IOE) identifies and evaluates potential measures, while the Medium-Term Improvement Plan (MTIP) provides a longer-term pathway for improving the dwelling.
Not every measure needs to be installed immediately.
A property might receive loft insulation, ventilation improvements and solar PV today, for example, while wall insulation, windows or heating improvements form part of a later stage.
The important thing is that today's work does not unnecessarily compromise tomorrow's.
The Retrofit Coordinator therefore needs to consider interactions, sequencing and opportunities.
This is one of the biggest differences between PAS 2035 and simply installing individual energy efficiency measures.
5. Managing the Retrofit Design Process
Once a package of measures has been established, those measures need to be properly designed.
This is another area where the roles are sometimes misunderstood.
The Retrofit Coordinator and Retrofit Designer are different roles, although PAS 2035 allows the same individual to fulfil multiple roles where appropriately qualified and where conflicts of interest are absent or appropriately declared and managed.
The Retrofit Designer develops the technical solution.
The Retrofit Coordinator oversees the process and needs to be satisfied that the design addresses the project requirements.
Depending on the project, the design may need to consider insulation build-ups, junctions, thermal bridges, ventilation, moisture risk, services, existing defects, enabling works and interfaces between different measures.
At PAS2035 Consultants, Retrofit Design and Retrofit Coordination can be provided together where appropriate. This can significantly simplify communication because the design team understands the property and project strategy rather than receiving isolated information at different stages.
6. Coordinating the Installer – Without Taking Over the Installer's Responsibilities
The Retrofit Coordinator also provides an important interface with the installer.
However, there needs to be a clear distinction between coordination and installation responsibility.
The Retrofit Coordinator does not make an installer PAS 2030 compliant.
The installer remains responsible for holding the appropriate PAS 2030 certification for the measures it installs and for complying with the requirements applicable to its installation.
TrustMark's Framework Operating Requirements distinguish the roles clearly: Retrofit Assessors and Retrofit Coordinators must meet the applicable PAS 2035 requirements, while installers are required to be appropriately MCS and/or PAS 2030 certified and TrustMark registered where applicable.
The Coordinator can review information, identify problems, request clarification and coordinate design changes.
But an installer remains responsible for its own workmanship, competence, certification and installation obligations.
That separation is important for everyone involved.
7. Quality Assurance During Installation
Coordination does not stop when work starts.
Existing buildings regularly reveal surprises.
A wall may have a different construction from that recorded during assessment. Opening up may reveal deterioration. Services may conflict with proposed insulation. Roof or floor junctions may differ from assumptions.
These issues need to be managed.
The wrong response is simply to alter the installation on site without considering how the change affects the wider design.
The Retrofit Coordinator can provide the route through which issues are raised, referred to the appropriate designer or specialist and resolved.
PAS 2035:2023 also includes risk-based site oversight. TrustMark identifies mandatory site visits for measures including External Wall Insulation, Internal Wall Insulation, Room-in-Roof Insulation, Underfloor Insulation, Park Home Insulation and Flat Roof Insulation.
Good coordination therefore involves understanding what is happening on site, not simply reviewing paperwork afterwards.
8. Evidence, Handover and TrustMark Lodgement
The Retrofit Coordinator also has significant responsibilities around project records.
TrustMark states that the Retrofit Coordinator is responsible for ensuring that the required outputs from the relevant roles are lodged into the Data Warehouse, and its Framework Operating Requirements state that lodgement is generally made by the Retrofit Coordinator responsible for the works unless a particular scheme specifies another lodging party.
This can involve a substantial amount of information.
Assessments, designs, photographs, certificates, commissioning information, installation evidence, guarantees and other documentation can quickly become difficult to manage across tens or hundreds of properties.
This is where having a good digital workflow becomes extremely valuable.
Using PASHUB to Manage PAS 2035 Projects
For our own delivery, PASHUB provides one of the most straightforward CRM-style systems for managing the PAS 2035 process.
Rather than trying to coordinate hundreds of documents through spreadsheets, email chains and separate folders, a dedicated retrofit platform allows projects to progress through a structured workflow.
For a Retrofit Coordinator, the benefit is visibility.
You need to know which properties have been assessed, which require additional information, which designs are outstanding, which have progressed to installation, where evidence is missing and which projects are ready for completion or lodgement.
That becomes increasingly important at scale.
The technology does not replace professional judgement. A CRM cannot decide whether an unusual solid-wall construction is suitable for a particular insulation strategy or whether a proposed detail adequately manages moisture risk.
But it can make sure the professional has the right information in front of them at the right stage.
For PAS2035 Consultants, combining experienced technical oversight with a structured PASHUB workflow allows the administrative process to support the technical process rather than overwhelm it.
Why Consider an External Retrofit Coordinator?
PAS 2035 does not require the Retrofit Coordinator always to be from a completely separate company.
In fact, PAS 2035:2023 expressly allows one person to fulfil multiple retrofit roles where they hold the required qualifications, provided there is no conflict of interest or any conflict is reported to the client and appropriately managed.
However, there can be significant practical benefits to appointing an external Retrofit Coordinator.
Consider a project where the same commercial organisation sells the measure, installs the measure and controls the PAS 2035 process.
If a problem arises, there can potentially be competing commercial pressures.
Should the property proceed?
Should additional enabling works be required?
Is a design change necessary?
Is the evidence adequate?
Should an installation be challenged?
An external Coordinator creates greater organisational separation between the installation business and the person overseeing the PAS 2035 process.
That does not automatically make an external Coordinator "more compliant", nor does PAS 2035 prohibit an installer-connected Coordinator. But independence can make conflicts easier to avoid and professional decisions easier to demonstrate.
Independent Oversight Can Protect the Installer Too
External coordination should not be viewed as the Retrofit Coordinator policing the installer.
Done properly, it can protect all parties.
An installer may encounter something on site that was not visible during assessment. Rather than being expected to make a design decision outside its remit, the issue can be referred back through the Coordinator.
Likewise, if the original design is unsuitable or incomplete, an independent Coordinator can help ensure that responsibility is directed to the appropriate professional rather than automatically becoming an installation issue.
That distinction becomes particularly valuable on larger programmes.
The aim should be collaboration with clearly defined responsibilities:
Assessor → Designer → Coordinator → Installer → Quality Assurance
Everyone contributes to the same project, but everyone understands what they are responsible for.
Retrofit Coordination for Housing Providers
External coordination can be particularly valuable for housing associations, local authorities and other organisations delivering retrofit across large portfolios.
The Coordinator can provide a consistent technical layer between the client and multiple installers.
That can help maintain common standards for assessment, design, evidence, defects, technical queries and handover even where several contractors are delivering different measures.
At PAS2035 Consultants, this is how we see the strongest version of the Retrofit Coordinator role: not as another administrative layer, but as part of the client's technical oversight function.
The Coordinator can understand the client's programme objectives while still working constructively with designers, assessors and installers to get properties completed.
Monitoring and Evaluation
The Retrofit Coordinator's involvement does not necessarily end when the installer leaves the property.
PAS 2035 includes monitoring and evaluation of retrofit outcomes. The Retrofit Evaluator role is itself filled by a suitably qualified Retrofit Coordinator, although PAS 2035:2023 imposes additional independence requirements where further monitoring and evaluation is undertaken.
The purpose is important.
Retrofit should ultimately be judged by outcomes, not simply by whether products were installed.
Did the measures achieve what the project intended?
Are there problems that need investigating?
Is there anything that can be learned and applied to future properties?
On a large programme, those lessons can become extremely valuable.
So, What Does a Retrofit Coordinator Actually Do?
The simplest description is that the Retrofit Coordinator holds the PAS 2035 process together.
They take the project from understanding the existing dwelling through to identifying appropriate improvements, coordinating design, overseeing delivery, managing evidence and evaluating the completed retrofit.
TrustMark places substantial responsibility on the role. Management of retrofit works and their compliance sits with the Retrofit Coordinator or other specified lodging party, while the parties undertaking the individual functions must themselves hold the appropriate qualifications and registrations.
That is why Retrofit Coordination should be more than document processing.
A strong Coordinator needs technical understanding, organisational ability, professional judgement and the confidence to challenge something when it does not look right.
At PAS2035 Consultants Ltd, we can provide an external Retrofit Coordination service alongside Retrofit Design and wider technical consultancy. Using structured systems such as PASHUB helps us keep projects moving efficiently, while remaining outside the installation business provides a valuable degree of separation between technical oversight and commercial delivery.
The installer remains responsible for its PAS 2030 certification, installation competence and workmanship. The Retrofit Coordinator remains responsible for coordinating the PAS 2035 process.
When those responsibilities are clearly understood, the Retrofit Coordinator stops being another layer of paperwork and becomes what the role was intended to be:
the professional helping to make sure that the right retrofit is properly considered, properly designed, properly delivered and properly evidenced.
TrustMark – PAS 2035 guidance | TrustMark – Retrofit Portal | BSI – PAS 2035:2023 overview