Turning retrofit strategy into a compliant, coordinated and buildable design
The Retrofit Designer sits at the point where retrofit strategy becomes something that can actually be delivered.
A Retrofit Assessment establishes what is there. The Improvement Option Evaluation and Medium-Term Improvement Plan establish how the property could be improved. The Retrofit Coordinator oversees the PAS 2035 process.
The Retrofit Designer turns that information into the technical design for the works.
That makes the role considerably broader than selecting an insulation product or attaching standard manufacturer details to a project file. A good Retrofit Designer needs to understand the existing building, the proposed measures, the interaction between those measures and, crucially, how the design will actually be constructed.
Under PAS 2035:2023, the design process is intended to take a whole-dwelling approach. TrustMark's design guidance expects designers to work from adequate assessment and pre-installation information, establish the scope and sequence of the work, consider applicable technical requirements and provide sufficient information for the measures to be properly installed.
At PAS2035 Consultants Ltd, we take that principle a stage further.
A Retrofit Design needs to be technically robust enough to demonstrate compliance, but it also needs to work for the installer standing on site.
Those are two different requirements, and a good design needs to achieve both.
What Is Retrofit Design?
Retrofit Design is the process of developing the technical solution for improving an existing dwelling.
This sounds straightforward, but existing buildings are rarely straightforward.
Two houses that look almost identical from the street can have very different construction histories. One may have a suspended timber floor while its neighbour has been converted to solid concrete. One may have an original solid wall while another has received a later extension. Roofs, windows, services, ventilation arrangements and previous repairs can all vary.
Retrofit therefore cannot simply be designed by selecting a standard measure from a catalogue.
The Retrofit Designer has to take the information gathered about the property and determine how the proposed measures should actually be incorporated into that particular building.
That means considering not only the measure itself but its interfaces with the rest of the dwelling.
For example, an External Wall Insulation design is not simply a specification for insulation thickness. The designer may need to consider windows and doors, eaves, verges, DPC and ground levels, services, vents, meter boxes, adjoining walls, rooflines and numerous other junctions.
Likewise, loft insulation cannot be considered entirely separately from ventilation, airtightness, electrical services, roof construction and the junction between the loft insulation and wall insulation.
This is why PAS 2035 is based around a whole-dwelling approach.
From Retrofit Assessment to Retrofit Design
A designer cannot produce a good design without good information.
The Retrofit Assessment provides much of the starting information about the dwelling, including its construction, condition, energy characteristics and ventilation arrangements.
The designer then needs to review whether that information is sufficient for the proposed works.
TrustMark's PAS 2035:2023 Design Best Practice Guidance specifically asks whether sufficient information has been obtained from the Retrofit Assessment, Pre-Installation Building Inspection and any necessary pre-design surveys before design begins.
That is an important distinction.
The Retrofit Designer should not simply inherit information and assume it must be correct.
If a proposed measure depends upon something that has not been adequately established, further information may be required.
At PAS2035 Consultants, this can involve reviewing detailed site notes, photographs, measurements, RdSAP information, existing construction and other project evidence.
For straightforward properties, good-quality digital information may allow much of this to be undertaken remotely.
Where a property or proposed package is more complicated, a designer site inspection may be appropriate, either remotely with additional targeted evidence or through an in-person inspection depending on the complexity and risk.
The principle is proportionality: obtain enough information to design the project properly rather than creating unnecessary process for its own sake.
Designing the Whole Retrofit Package
One of the Retrofit Designer's most important responsibilities is making sure that individual measures form a coherent overall design.
A project might include:
- loft insulation;
- external or internal wall insulation;
- floor insulation;
- windows and doors;
- ventilation improvements;
- heating measures;
- solar PV;
- airtightness improvements; and
- associated enabling works.
Each measure may have its own technical requirements.
But the property only has one building fabric.
The designer therefore needs to consider what happens where measures meet.
If wall insulation meets loft insulation, is there continuity?
If new windows are being installed alongside wall insulation, how is that junction treated?
If insulation changes the airtightness of the property, what are the consequences for ventilation?
If services penetrate a newly insulated element, how should those penetrations be treated?
What happens around existing vents, cables, pipework, meter boxes, drainage and other services?
This is where Retrofit Design adds significant value.
The designer is not simply asking:
"Is this individual measure acceptable?"
They are asking:
"How does this measure work as part of the overall retrofit of this dwelling?"
Designing Out Problems Before Installation
One of the greatest benefits of good design is that problems can be identified while they are still relatively inexpensive to solve.
Finding an issue on a drawing is generally much easier than discovering it after scaffolding has been erected and an installation team is waiting to start work.
The design process should therefore consider known defects and constraints before installation.
These might include damp or water penetration, defective rainwater goods, unusual construction, difficult junctions, existing ventilation deficiencies, roofline limitations, services that require alteration or areas requiring enabling works.
Not every problem will be apparent before opening up a building.
Retrofit involves existing properties and unexpected conditions will always occur.
But the purpose of design is to remove as much uncertainty as reasonably possible and establish a clear route for dealing with the remainder.
This can reduce aborted works, variations, site queries and inappropriate improvised solutions.
Translating Standards into a Property-Specific Design
PAS 2035 does not operate in isolation.
Depending on the measures involved, the Retrofit Designer may need to consider Building Regulations, PAS 2030 requirements, relevant British Standards, system requirements, product certification, manufacturer's instructions and other technical guidance.
The important word is consider.
A design should not simply reproduce hundreds of pages of technical standards.
The designer's job is to determine which requirements are relevant to the particular property and translate them into a usable design.
TrustMark's design guidance places emphasis on the appropriate technical standards, product and system requirements and applicable regulatory requirements forming part of the design process.
That is where professional judgement becomes important.
A standard provides requirements and principles.
The Retrofit Designer applies them to this building, this measure and this set of circumstances.
The Overarching Retrofit Design
At PAS2035 Consultants, the core of our service is the overarching Retrofit Design.
Rather than treating every measure as a separate piece of paperwork, the design brings the proposed package together.
It establishes the property, proposed measures, construction, key design decisions, relevant interfaces and requirements that need to be satisfied.
This creates a central technical document for the project.
It also gives the Retrofit Coordinator a clear basis for reviewing the proposed work and subsequently checking that the completed installation reflects the design.
Where required by the property or measure package, we then incorporate or provide the additional design elements needed for that particular project.
These can include Heritage Impact Assessments (HIA), HDC/heating design information, flood considerations or strategy, ventilation strategy, bespoke airtightness strategy and other property or measure-specific technical requirements.
Not every property requires every additional assessment.
The objective is to identify what the particular project requires and incorporate those elements into the wider design rather than generating unnecessary documents.
Designing for TrustMark and PAS 2035 Compliance
The design also needs to provide a clear route through the applicable PAS 2035 and TrustMark requirements.
TrustMark makes clear that products and systems incorporated into PAS 2035 projects are specified by the competent Retrofit Designer, while installation is undertaken by appropriately competent and certified installers.
Those roles should remain distinct.
The designer is responsible for the design within their appointed scope.
The installer remains responsible for its own PAS 2030 certification, competence, workmanship and installation obligations.
The Retrofit Coordinator oversees the wider PAS 2035 process.
Clear separation of these responsibilities is important because good retrofit depends upon competent people performing clearly defined roles rather than one party informally absorbing responsibility for everything.
But Who Is the Design Actually For?
This is where we believe Retrofit Design needs to go further.
A design has several audiences.
It needs to demonstrate technical compliance.
It needs to provide information for the Retrofit Coordinator.
It may need to satisfy clients, auditors and funding requirements.
But ultimately, somebody has to build it.
That person could be a site manager overseeing several properties, a supervisor planning labour and materials or an installer arriving at a dwelling first thing in the morning.
They do not necessarily need to read every page of every document before they can understand the job.
And this creates a practical problem.
A 150-Page Design Pack Is Not a Site Tool
A PAS 2035 project can accumulate an enormous amount of documentation.
The assessment alone can contain dozens of pages.
Add site notes, photographs, RdSAP information, specifications, product certification, calculations, ventilation information, heritage documents, drawings, technical guidance and installation requirements and the project information can easily run to 100 or 150 pages.
Much of that information may be necessary.
But simply sending all of it to an installer does not mean the design has been communicated effectively.
Imagine a site manager responsible for ten properties.
For each property they receive 150 pages.
Somewhere within those documents is a photograph showing a defect that needs correcting.
Somewhere else is a ventilation requirement.
Another document identifies an unusual service penetration.
A drawing contains an important junction.
Another report identifies a conservation consideration.
Technically, all of the information has been supplied.
Practically, it has become difficult to use.
More information does not automatically mean better communication.
That is why our design process includes something specifically intended for site delivery.
The Site Installation Document – SID
At PAS2035 Consultants, we produce a Site Installation Document, or SID, alongside the wider technical design.
The SID is deliberately different from the main design.
The overarching design contains the technical detail required to establish and support the solution.
The SID asks a different question:
What does the person delivering this property actually need to know?
Typically, the answer can be communicated in around 2–5 image-heavy pages.
This is not intended to replace the complete Retrofit Design, specifications, manufacturer instructions or PAS 2030 requirements.
It is the site-facing summary of the property-specific design.
What Goes into the SID?
The SID brings together the critical information that would otherwise be spread across numerous documents.
The first thing it establishes is the property and measure package.
The site manager can immediately see what property they are dealing with and what measures form part of the job.
Next are identified defects and required remediation.
Where possible, we use photographs.
Instead of a sentence buried deep within a report saying that a particular section of wall shows evidence of water penetration, the SID can show the relevant elevation, identify the defect and state what needs to happen.
That makes the requirement much harder to overlook.
The SID can also contain tenant or occupant information relevant to delivery, where appropriate.
Then there is special property information.
Is the building historically significant?
Is it within a conservation area?
Are there flood considerations?
Is there an unusual construction detail?
Is there something specific about access or an elevation that the installation team needs to know?
Put it where they can see it.
Short-Form Ventilation and Measure Information
The SID also condenses the wider technical strategy.
The full design might contain detailed ventilation information.
The SID gives the site team the short-form ventilation strategy: the practical requirements they need to implement or check.
The same principle applies to individual measures.
Rather than repeating every paragraph of a specification, each measure receives concise "need to know" information.
What are the important property-specific requirements?
What needs particular attention?
What should not be altered?
What interface is critical?
What enabling work needs completing first?
This is information designed for use rather than simply storage.
Floor Plans and Elevations
Visual information is particularly valuable on site.
Our SID therefore incorporates floor plans and elevations where appropriate to make the scope immediately understandable.
A drawing can often communicate in seconds what several paragraphs would struggle to explain.
Measures can be associated with specific elevations.
Defects can be located.
Ventilation requirements can be related to individual rooms.
Important external features can be highlighted.
Unusual interfaces can be made obvious.
The document becomes a visual map of the installation rather than another report.
Making Retrofit Easier to Price
The SID also has a commercial benefit.
Before anybody installs the work, somebody has to price it.
A contractor presented with numerous separate technical documents needs time to establish exactly what is included.
That creates cost and increases the possibility that something important will be missed.
A concise SID allows the estimator to understand the property much more quickly.
They can see:
the measures, the property layout, the defects, the enabling works, the special considerations and the important installation requirements.
That makes pricing more practical and time-effective.
Across a programme containing tens or hundreds of properties, the difference can become significant.
The SID therefore helps connect technical design with commercial reality without diluting the underlying technical requirements.
The SID Comes Back at Completion
Perhaps the most useful feature of the SID is that its job does not end when installation starts.
The same document can become a post-retrofit checklist for Retrofit Coordination.
If the design identified a defect requiring remediation, was it resolved?
If an elevation required a particular treatment, was it followed?
If the ventilation strategy required an intervention, was it completed?
If a critical junction was highlighted, does the evidence demonstrate that it was installed correctly?
If a particular feature required protection, has it been retained?
This creates a simple but powerful feedback loop:
Assessment → Design → SID → Installation → Evidence → Coordination
The information communicated to the installer before work starts becomes the information against which the completed project can subsequently be reviewed.
That is much more useful than producing a design document that disappears into a folder as soon as installation begins.
Retrofit Design Should Make Delivery Easier
Ultimately, the Retrofit Designer's job is not to produce paperwork.
It is to produce a properly considered technical solution for an existing building.
That requires understanding construction, identifying interfaces, managing risk, interpreting technical requirements and communicating the resulting design.
At PAS2035 Consultants Ltd, our approach combines the overarching Retrofit Design with whatever additional project-specific information is required, including HIA, HDC, flood, ventilation, airtightness and other technical considerations where applicable.
But we place particular emphasis on what happens next.
Can the installer understand the design?
Can the estimator price it?
Can the site manager quickly identify what is different about this property?
Can the Retrofit Coordinator later check whether the important requirements were actually delivered?
That is the purpose of the SID.
The full design provides the technical foundation.
The 2–5 page, image-heavy Site Installation Document turns that design into something the delivery team can actually use.
Because a Retrofit Designer should not measure the quality of a design by how many pages it contains.
The real measure is whether the right solution has been designed, whether the people installing it understand what is required and whether the completed work can be demonstrated to match the design.
That is what good Retrofit Design should achieve.