1. Awaab’s Law Explained: What Social Landlords and Retrofit Professionals Need to Know

Why the new repair requirements could make retrofit an increasingly important part of the solution to problematic housing stock
15 October 2026 by
Joseph Nelson

Awaab’s Law represents a major change in the way social landlords in England are expected to respond to hazards in their homes.

Its importance extends well beyond damp and mould.

The legislation establishes legally prescribed timescales for investigating and addressing hazards in social housing. Phase 1 came into force on 27 October 2025, initially covering significant damp and mould hazards alongside all emergency hazards. From 30 November 2026, Phase 2 substantially expands the significant hazards covered to include excess cold, excess heat, falls, structural collapse, fire and explosions, electrical hazards and domestic hygiene hazards.

For social landlords, this creates an obvious compliance challenge.

But it should also prompt a wider strategic question:

If a housing provider is going to spend significant sums correcting recurring problems in poorly performing homes, can some of that investment be coordinated with planned retrofit and decarbonisation programmes so that the underlying building is improved at the same time?

In many cases, we believe the answer will be yes.

Not because Awaab’s Law itself provides retrofit funding.

It does not.

But because many of the conditions that contribute to housing hazards — cold internal surfaces, inadequate insulation, ineffective heating, poor ventilation, thermal bridging, uncontrolled solar gain and deteriorating building fabric — are also issues considered when developing a good whole-dwelling retrofit strategy.

That creates an opportunity for housing providers to stop treating asset condition, resident health and decarbonisation as completely separate programmes.

What Is Awaab’s Law?

Awaab’s Law is the name commonly given to the requirements introduced through section 10A of the Landlord and Tenant Act 1985 and the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025.

The regulations apply to social housing in England within their defined scope.

At its core, the legislation requires social landlords to respond to relevant hazards within prescribed timescales.

A significant hazard is one presenting a significant risk of harm to an occupier's health or safety — essentially a risk that a reasonable landlord with the relevant knowledge would address as a matter of urgency.

An emergency hazard goes further: it presents an imminent and significant risk of harm that a reasonable landlord would make safe within 24 hours.

That distinction is important.

Awaab’s Law is not simply a list of defects.

It is risk-based.

The condition of the property matters.

But so do the circumstances of the people actually occupying it.

Phase 1 Changed the Response to Damp and Mould

Since 27 October 2025, social landlords have been required to investigate significant damp and mould hazards within prescribed timescales.

Government guidance summarises the principal Phase 1 requirements as:

  • emergency hazards must be investigated and made safe within 24 hours;
  • potential significant damp and mould hazards must generally be investigated within 10 working days;
  • where a significant hazard is identified, relevant safety works must generally be completed within 5 working days after the investigation concludes;
  • a written summary must generally be provided within 3 working days after the investigation; and
  • where supplementary preventative work is required to prevent recurrence, the landlord must start that work, or take specified steps towards it, within the applicable timeframe.

The important word for retrofit professionals is recurrence.

Making a mould-covered wall visually clean is not necessarily the same as resolving why mould developed there.

If the underlying problem is a leak, repair the leak.

If it is inadequate ventilation, the ventilation needs addressing.

If the property has persistently cold internal surfaces because of poor thermal performance, the building fabric may require attention.

Often it will be a combination.

Government guidance expressly recognises deficiencies such as a lack of thermal insulation in the structure of a home leading to excessive mould growth as potentially relevant to Awaab’s Law.

This is where the relationship with retrofit becomes particularly interesting.

Phase 2 Makes This Much Bigger

From 30 November 2026, the scope widens substantially.

Significant hazards brought within Phase 2 include:

excess cold; excess heat; falls; structural collapse; fire and explosions; electrical hazards; and domestic hygiene hazards.

Emergency hazards continue to cover the wider range of prescribed HHSRS hazards other than overcrowding.

This means housing providers increasingly need systems capable of identifying and responding to hazards across the whole dwelling.

And several Phase 2 hazards intersect directly with retrofit.

Consider excess cold.

The updated HHSRS guidance describes this in terms including an inability to sufficiently heat the property because of inadequate cost-effective heating, insulation or draughts.

Those are exactly the sorts of issues retrofit programmes routinely seek to address.

The Connection Between Awaab’s Law and Retrofit

Awaab’s Law and PAS 2035 are not the same thing.

They have different purposes.

Awaab’s Law establishes obligations relating to hazards and the timescales within which social landlords must respond.

PAS 2035 provides a structured process for assessing, planning, designing, coordinating and evaluating domestic energy retrofit.

But there is significant practical overlap.

A PAS 2035 Retrofit Assessment considers the existing dwelling.

A good Retrofit Design considers the building fabric, ventilation, proposed measures and their interactions.

PAS 2035:2023 also places explicit emphasis on issues including ventilation defects, pre-installation building inspection, airtightness and property-specific design. TrustMark's implementation of PAS 2035:2023 requires inadequate existing or combustion ventilation to be identified and addressed at design stage.

This means a property entering a properly managed retrofit programme is already being examined through a process capable of identifying many of the conditions relevant to Awaab’s Law.

The opportunity is to connect those systems.

Stop Thinking in Separate Budgets

Housing providers traditionally have multiple programmes operating simultaneously.

Responsive repairs.

Planned maintenance.

Damp and mould.

Heating.

Decent Homes.

Energy efficiency.

Net zero.

Capital works.

Resident complaints.

Each may have its own budget, contractor, database and management structure.

But the building does not know which budget is paying for the work.

Imagine a cold property with recurring mould.

The damp and mould team may clean and treat the affected areas.

The heating team may repair the boiler.

The planned maintenance programme may later replace windows.

Then, several years later, the net-zero programme may install insulation and ventilation.

Each intervention can be legitimate.

But viewed as a building, the sequence can be inefficient.

A whole-dwelling approach asks:

Why is this property repeatedly presenting problems, and what combination of interventions provides the best long-term solution?

That is precisely where retrofit consultancy can add value.

Awaab’s Law Should Drive Better Stock Intelligence

The first opportunity is data.

A housing provider may already know which homes generate recurring damp and mould complaints.

It knows which homes have repeated heating failures.

It knows which archetypes perform poorly.

It knows which properties are difficult to heat.

It knows where condensation complaints cluster.

It has EPC information.

It has repairs histories.

It has stock-condition data.

Increasingly, it will also have Awaab’s Law hazard information.

These datasets should not remain isolated.

They can be combined to identify problematic stock that is also strategically suitable for retrofit.

At PAS2035 Consultants, we already use this philosophy when supporting housing providers with programme development: multiple property and programme variables can be reduced into structured selection tools that identify the most achievable and beneficial targets.

For Awaab’s Law, the same principle can go further.

A recurring damp and mould hotspot should not simply generate another repair ticket.

It should become intelligence for the asset-management and retrofit strategy.

The Two-for-One Opportunity

This creates what could be described as a two-for-one investment opportunity.

Again, the wording needs care.

A landlord cannot simply relabel statutory repairs as retrofit and assume government will fund them.

Scheme eligibility, eligible measures, cost rules and funding agreements still apply.

But where a property qualifies for an existing decarbonisation programme, the landlord can potentially coordinate necessary asset investment with funded or co-funded energy improvements.

The Warm Homes: Social Housing Fund Wave 3 provides a good example.

The programme has £1.29 billion allocated nationally and supports improvements to eligible social homes below EPC C, with objectives including warmer and more energy-efficient homes, lower carbon emissions, reduced fuel poverty and improved comfort, health and wellbeing. Delivery runs through to 2028.

That creates a strategic opportunity.

Instead of selecting homes for retrofit purely because they have a low EPC, landlords can increasingly consider:

Which low-performing homes also create the greatest asset-management and resident-health burden?

Those may be particularly valuable homes to prioritise.

Damp and Mould Is the Obvious Example

Suppose a home has persistent condensation and mould.

A competent investigation should establish why.

Perhaps there is penetrating damp.

That needs repairing.

Perhaps there is a plumbing leak.

That needs repairing.

Perhaps an extractor fan has failed.

That needs addressing.

But perhaps the wider investigation finds:

poor insulation;

cold external walls;

pronounced thermal bridging;

insufficient background ventilation;

ineffective extract ventilation;

an inefficient heating system;

and significant difficulty maintaining adequate internal temperatures.

Simply cleaning the mould does not address that combination.

A coordinated retrofit could potentially include insulation, ventilation improvements, airtightness measures where appropriate and heating improvements.

The aim is not to hide a repair inside a retrofit programme.

The aim is to understand the building properly and solve the causes rather than repeatedly treating the symptoms.

PAS 2035 Provides the Framework

This is where PAS 2035 becomes useful.

The Retrofit Assessor gathers information about the dwelling.

The Retrofit Coordinator considers the wider process, risks, defects and Intended Outcomes.

The Retrofit Designer develops the technical solution.

The PAS 2030 installer delivers the specified measures.

The process therefore creates an established structure through which housing providers can consider how energy improvements interact with the existing building.

At PAS2035 Consultants, we believe Awaab’s Law should increasingly become part of that design context.

If a property has a history of mould, the Designer should know.

If there is an excess-cold concern, the Designer should know.

If residents have repeatedly complained about overheating, that should form part of the information available.

If there is a known fall risk or building defect, the retrofit should not inadvertently make it worse.

The Retrofit Design should respond to the real property, not merely the EPC model.

Retrofit Can Also Create Hazards

There is an important warning.

Retrofit is not automatically the solution.

Poor retrofit can itself create or exacerbate problems.

Insulating a property without addressing ventilation can increase moisture risk.

Increasing airtightness without an adequate ventilation strategy can damage indoor air quality.

External insulation can create problems if junctions and water management are badly designed.

Internal insulation needs careful consideration of moisture.

Solar-control decisions can influence overheating.

Services moved or altered during works can create safety issues.

Changes to thresholds, external levels or access arrangements can potentially influence fall risks.

That is why PAS 2035's whole-dwelling approach matters.

The objective is not:

"Install more insulation because Awaab’s Law exists."

It is:

"Understand the hazard, understand the building, then design an appropriate solution."

Excess Cold Will Put Fabric Performance Under Greater Scrutiny

Phase 2 could make this particularly important.

HHSRS recognises excess cold as a housing hazard and links it to the ability to maintain adequate warmth, including the effects of heating, insulation and draughts.

For social landlords, that could make poor thermal performance increasingly difficult to view purely as a net-zero issue.

Historically, a poorly insulated property might have been considered:

expensive to heat, but suitable for future retrofit.

Increasingly, the question may be:

is the condition of this dwelling creating a significant health and safety hazard for this particular household?

That is a very different asset-management conversation.

Excess Heat Will Require Equal Attention

The same applies in summer.

Retrofit has traditionally focused heavily on winter energy performance.

But Phase 2 explicitly includes excess heat.

That means designers and landlords need to consider overheating.

Solar gain.

Glazing.

Orientation.

Ventilation.

Shading.

Internal gains.

Roof construction.

The consequences of insulation and airtightness.

A home should not be made more energy efficient in winter at the expense of becoming dangerously uncomfortable during summer.

Again, this supports a whole-dwelling approach.

Housing Providers Need a Joined-Up Team

Awaab’s Law therefore cannot sit exclusively with the repairs department.

Nor should retrofit sit exclusively with the sustainability department.

The future needs stronger connections between:

housing management; asset management; repairs; damp and mould teams; resident liaison; Retrofit Assessors; Retrofit Designers; Retrofit Coordinators; PAS 2030 installers; Building Safety professionals; and data teams.

That does not mean everyone needs to attend every meeting.

It means information needs to travel.

A serious recurring damp issue should inform future retrofit selection.

A Retrofit Assessment identifying a potentially serious defect should reach the appropriate housing team.

An Awaab’s Law investigation revealing poor thermal performance should be capable of triggering consideration for planned energy investment.

The organisation should increasingly see one property record, not a series of disconnected programmes.

PAS2035 Consultants and the Future Model

At PAS2035 Consultants Ltd, we see an important role for retrofit consultancy in helping housing providers create that connection.

Our core function remains Retrofit Design and wider PAS 2035 consultancy.

We can work alongside a landlord's existing Retrofit Assessors, in-house Retrofit Coordinators, installers, asset teams and other specialists.

The objective is not to turn the Retrofit Designer into an Awaab’s Law compliance officer.

It is to make sure the information relevant to the building informs the retrofit.

Where problematic stock is being considered for investment, we can help evaluate whether retrofit measures provide part of the long-term solution.

Where a property progresses into retrofit, we can design those measures around the actual defects, construction and risks present.

And where additional specialist input is needed, that should be identified rather than guessed.

From Reactive Repairs to Preventative Investment

This is perhaps the biggest opportunity Awaab’s Law creates.

The legislation is necessarily reactive in one sense.

A potential hazard is identified.

The landlord investigates.

If required, it makes the property safe.

But good asset management should ultimately become preventative.

If ten properties of the same archetype have similar problems, do we wait for the eleventh resident to complain?

Or do we use what has been learned to investigate the remaining stock?

If cold bridges repeatedly generate mould in one house type, should that knowledge inform future retrofit?

If a particular ventilation arrangement repeatedly performs poorly after insulation, should the design standard change across the programme?

If certain top-floor flats repeatedly overheat, should those properties be prioritised for overheating interventions?

This is where the combination of Awaab’s Law data and retrofit data becomes powerful.

The Business Case Is Bigger Than Carbon

For years, the business case for retrofit has often been expressed through:

energy savings;

carbon reductions;

EPC improvements;

fuel poverty;

and progress towards net zero.

All remain important.

Awaab’s Law adds another dimension.

Avoided property failure.

If retrofit investment also helps reduce recurring mould treatment, heating complaints, condensation damage, emergency repairs and deterioration of the building fabric, the financial case is broader than the energy model alone suggests.

There are also potential benefits from improved resident satisfaction, fewer complaints, reduced disruption and better preservation of the housing asset.

That does not mean every repair should become a retrofit project.

It means the financial appraisal should recognise where the two objectives overlap.

Awaab’s Law Is Not PAS 2035 — But They Can Work Together

The distinction remains important.

Awaab’s Law is legislation establishing repair obligations and timescales.

HHSRS provides the hazard framework against which housing conditions are assessed. The revised 2026 HHSRS framework is risk-based and now covers 21 potential hazards.

PAS 2035 provides a framework for domestic energy retrofit.

Warm Homes and similar programmes provide mechanisms through which eligible energy improvements can be funded or co-funded.

They are not interchangeable.

But used intelligently, they can become parts of the same asset-management strategy.

What Social Landlords Should Be Doing Now

The strategic response should therefore be bigger than creating an Awaab’s Law repairs inbox.

Housing providers should be mapping hazards against their stock information.

Look for recurring damp and mould.

Map excess-cold risk against EPC performance and heating type.

Identify overheating-prone archetypes.

Connect repair histories with Retrofit Assessments.

Bring planned maintenance information into retrofit selection.

And identify properties where planned decarbonisation investment could simultaneously help address underlying conditions contributing to resident-health risks.

This is particularly relevant while substantial publicly supported retrofit programmes are already underway.

The money cannot simply be redirected wherever a landlord chooses.

But stock selection and programme planning can be smarter.

One Home, One Strategy

A resident does not care which departmental budget repaired their home.

They care that the home is warm.

Dry.

Safe.

Affordable to heat.

Properly ventilated.

Comfortable in summer.

And free from hazards that affect their health and safety.

That should increasingly be the objective of housing investment too.

Awaab’s Law creates a much stronger legal framework around responding to hazards.

PAS 2035 creates a structured framework around improving energy performance.

The HHSRS creates a framework for understanding housing risk.

And programmes such as Warm Homes: Social Housing Fund create investment opportunities for improving eligible stock.

The opportunity for social landlords is to stop treating these as four unrelated conversations.

Problematic housing stock is often exactly the stock that most needs investment.

Where that stock is also suitable and eligible for energy-efficiency funding, there is an opportunity to use planned retrofit investment to contribute towards solving some of the underlying conditions that would otherwise continue generating repairs, complaints and health risks.

Not every Awaab’s Law problem is a retrofit problem.

Not every repair can be grant funded.

And no energy-efficiency programme removes a landlord's obligation to make a dangerous home safe within the statutory timeframe.

But where the objectives genuinely overlap, the sensible approach is clear:

repair the immediate problem, understand the root cause, and use the next round of investment to make the home fundamentally better.

That is where Awaab’s Law and retrofit can become much more powerful together.

For the underlying requirements, see Awaab’s Law Phase 1 guidance for social landlords, Awaab’s Law Phase 2 guidance, the updated HHSRS guidance and Warm Homes: Social Housing Fund Wave 3 guidance.

Joseph Nelson 15 October 2026
Share this post
Tags
Archive